Every GresBox project runs the same way: discovery, design, build, launch, support. The point of writing it down is that you can hold us to it, and can tell at any moment which step you are in.

Why this is written down

Most disputes on software projects are not about quality. They are about expectation: what was in scope, what a milestone meant, who was supposed to supply the content, and when a change stopped being a clarification and started being new work.

A process that exists only as an understanding is an argument waiting to happen. So each step below names what happens in it and what you receive at the end, and the proposal you get after discovery says which of them applies to your project.

The five steps

  1. 01

    Discovery

    Discovery is a working session, not a qualification call. We go through the problem you are solving, the users you are solving it for, the systems the product has to talk to, and the constraints you are already carrying: an existing database, a team that has to maintain it, a launch date that will not move.

    We then write it down. The scoping document names the features in scope, the ones deliberately left out, the integrations, the assumptions we are making, and the sequence we would build in. It is the document we both point at later when something changes.

    What you receive

    • Written scope with features in and out
    • Technical approach and stack decisions, with the reasoning
    • Delivery sequence and milestone dates
    • A proposal covering deliverables and commercial terms
  2. 02

    Design

    Design starts from the flows that carry the most weight: sign-up, checkout, the main dashboard, whatever your product lives or dies on. We build those as full layouts rather than as a style guide, because a style guide never surfaces the case where the table has eleven columns and a long company name.

    Everything is designed against the breakpoints we will actually ship, with real copy and realistic data volumes. Where a screen needs an empty state, a loading state and an error state, you see all three.

    What you receive

    • Key screens at mobile and desktop widths
    • A component inventory the build reuses
    • Design tokens for colour, type, spacing and radius
    • Empty, loading and error states for every data-backed view
  3. 03

    Build

    Work is broken into cycles that each end with something you can open in a browser. That is deliberate: written status reports are easy to agree with and hard to verify, and a deployed environment is neither.

    The stack is React, Next.js and TypeScript on the front end, Node.js with Prisma and PostgreSQL behind it. TypeScript runs in strict mode and the schema is the source of truth for both, so a column rename is a compile error rather than a runtime surprise in production.

    What you receive

    • A staging URL updated every cycle
    • Source in your repository, with history, from day one
    • Typed API contracts shared by client and server
    • Database migrations under version control
  4. 04

    Launch

    The path to production is built and exercised well before launch: containerised builds, a reverse proxy terminating TLS, migrations running as part of the deploy rather than by hand, and health checks that verify the new container before traffic moves to it.

    We test the rollback too. A deployment process that has never been reversed is an assumption, and launch day is a poor time to find out which kind it was.

    What you receive

    • Automated deployment from your default branch
    • Database migrations applied as part of the deploy
    • Health checks and a tested rollback path
    • Handover notes covering environments, secrets and runbooks
  5. 05

    Support

    Software does not hold still. Dependencies get security patches, browsers change, traffic patterns shift, and the feature that made sense for a hundred users starts to strain at ten thousand.

    Support covers dependency and security updates, monitoring, performance work against Core Web Vitals, and a continuing development budget if you want one. If you would rather take it in house, the handover is written for that: the point of the process above is that nothing about the system lives only in our heads.

    What you receive

    • Dependency and security updates
    • Uptime and error monitoring
    • Core Web Vitals tracked against real field data
    • An agreed response window for incidents

Questions about how projects run

How do you scope and quote a project?

Every engagement starts with a discovery call, after which we send a written proposal covering deliverables, milestones, timeline and commercial terms. Nothing is committed until you have reviewed that document.

How long does a project take?

A focused build is usually two to four weeks. A larger application with multiple integrations and user roles typically runs six to ten weeks. The proposal from discovery gives you dated milestones rather than a range.

Can we change the scope once work has started?

Yes. We work in short cycles specifically so that direction can change between them. Changes that affect the timeline are written down and agreed before we act on them, so nothing shifts silently.

How will we communicate during the project?

A shared channel for day-to-day questions, a short call at the end of each cycle to walk through what shipped, and a staging URL you can open at any time. You should never have to ask what state the project is in.

How does payment work?

Payment is structured around project milestones and invoiced against them. We accept bank transfer and UPI for clients in India, and international bank transfer for clients elsewhere.

What if we want to bring the project in house later?

That is a supported outcome, not a penalty. The code, the migrations, the deployment pipeline and the runbooks are all in your repository, and handover is a walkthrough rather than an excavation.

Start at step one

Discovery is a working session. Bring the problem, the constraints and the deadline you cannot move, and you leave with a written scope.